Skip to Content

Solutions · Operations electrification

Energy Subscription:electrical infrastructure as a service.

Finergy develops, invests in, builds, and operates the electrical infrastructure your operation needs — transmission lines, substations, and equipment. Your company does not invest in the infrastructure: it pays for the energy supplied at a competitive rate, subject to case-by-case analysis.

Is it right for your operation?

Energy Subscription solves three typical situations:

CASE 01

You operate with diesel

Generators that are expensive to operate and maintain, with fuel storage and handling risks.

CASE 02

The grid does not reach your site or is not enough

Your site does not have access to the electrical grid, or the available capacity limits your operation.

CASE 03

You want to grow your operation

Electrify processes and expand capacity without allocating capital to electrical infrastructure.

Benefits

01

Your company does not invest in the infrastructure

02

Savings of 15% to 60% in energy costs, depending on the case

03

The higher the consumption, the greater the rate discount

04

Operation and maintenance included

05

Energy monitoring and ongoing technical support

06

Purchase option, if applicable

More than savings

Energy securityto grow without limits.

  • Continuous and reliable electricity supply for your operation.
  • Eliminates diesel storage and handling risks.
  • Reduces emissions and polluting waste.
  • Supports the expansion and improvement of your electrical processes.

What the infrastructure may include

Each project is designed around the operation. Some typical components include:

Transmission and distribution lines Substations Transformers Electrical equipment Interconnection and process management with CFE
Typical project · Aquaculture sector

Electrifying an operation that currently depends on diesel

Example Energy Subscription proposal: the engineering scope includes a dedicated 10.2 km distribution line to connect the customer’s load center to the grid, fully replacing diesel generation — without the company investing in the infrastructure.

Estimated savings year 1
$7.3M MXN
vs current diesel cost
Rate savings
46%
$2.70 vs $5.00 per kWh
Diesel replaced
100%
of current generation

ESTIMATED FIGURES FROM THE EXAMPLE PROPOSAL · SAVINGS FOR EACH CASE ARE DETERMINED THROUGH ITS ANALYSIS

From your operation to energy supply

Six stages. Finergy coordinates every step.

STAGE 01

Tell us about your operation

Share your CFE bill if you have one or, if you operate with diesel, your approximate spending and consumption.

STAGE 02

We analyze current consumption and costs

We evaluate your energy situation and savings potential, at no cost and with no commitment.

STAGE 03

We design the project engineering

Infrastructure design, costing, timeline, and management of the CFE resolution process.

STAGE 04

We present the proposal and sign

Rate, infrastructure scope, and clear conditions for your subscription.

STAGE 05

We build the infrastructure

Finergy invests in, builds, and interconnects the project.

STAGE 06

We supply, operate, and monitor

Your operation receives energy at a competitive rate, with operation and maintenance, monitoring, and ongoing support.

Continue with diesel or choose Energy Subscription?

Operating with diesel
Finergy Energy Subscription
High and volatile cost per kWh
Competitive rate, subject to case-by-case analysis
Generator maintenance on your own
Operation and maintenance by Finergy
Fuel storage and handling risks
Continuous and reliable electricity supply
Emissions and polluting waste
Cleaner energy for your operation
CAPEX if you want to electrify
Payment for supplied energy

Frequently asked questions

Does my company have to invest in the infrastructure?

No. Finergy handles the development, investment, construction, and operation of the electrical infrastructure, subject to case-by-case analysis. Your company pays for the energy supplied.

Does it work if I currently operate with diesel?

Yes — it is one of the most common cases. Energy Subscription replaces diesel generation with electricity supply, eliminating fuel risks and costs.

What if my site does not have access to the CFE grid?

The project may include the infrastructure needed to connect you — dedicated lines, substations, and management of the CFE resolution process.

How much can I save?

Between 15% and 60% in energy costs, depending on the case. In addition, the higher the consumption, the greater the rate discount. Your operation’s savings are determined through the analysis.

Who operates and maintains the infrastructure?

Finergy does, throughout the contract, with an energy monitoring platform and ongoing technical support.

What do I need to get started?

Your CFE bill if you have one or, if you operate with diesel or without a connection, your approximate consumption and spending data. With that, we prepare the analysis at no cost and with no commitment.

Tell us about your operation

With your CFE bill or consumption data, we prepare the analysis of your case at no cost and with no commitment.

Request my analysis Talk to Finergy

RESPONSE IN LESS THAN 48 HRS